VR Concrete was established in 1993 and is owned by Vincent Roscillo, Jr. and Michelle Roscillo.  Since that time, VR Concrete has had phenomenal growth.  Our relationship with our customers and employees has enabled us to build a solid reputation for providing quality, value, safety and integrity on every project.  Since we were established, we have never failed to complete a contract.

VR Concrete is a mid-sized commercial concrete contractor, specializing in heavy industrial concrete construction.  Our areas of expertise focus on Federal and State facilities, water and waste water treatment facilities, bridge construction, parking structures, large footprint retail spaces, retaining walls and flatwork.  Our company performs work throughout New England.

VR Concrete also works with companies to provide design build services.  When timely completion and project budgets are the primary concern, VR Concrete has helped clients meet their budgetary constraints and enabled them to proceed with their projects.

Our company maintains a large work force of well trained employees and has a large inventory of equipment that is in new to excellent condition.

VR Concrete is a Certified Small Business and a Certified Hub Zone Company.  We have a substantial bonding capacity to meet the needs of nearly any concrete project.  We understand what it takes and are able to provide the  manpower and know-how to deliver your project in a timely manner.  We consistently meet or beat the “fast track” schedules that are required in today’s construction market.

 

Rochester Bridge – Rochester, NH

This project included all site survey, construction, project management, quality control and administrative activities. This multi-phased contract started in the Summer of 2010 and completed in the Summer of 2011. It consisted of 3,300c.y. of concrete and over 200...

Manchester Waste Water Treatment Facility Upgrades – Manchester, NH

The Manchester WWTF needed to be upgraded to remain compliant with the ever changing EPA standards. VR Concrete, working with one of its long time clients, was tasked with the challenge of upgrading the facilities concrete structures without interrupting the daily...

Farmington Waste Water Treatment Plant – Farmington, NH

This project is a large sequential batch reactor tank that contains 1.2 million gallons of liquid. The project consisted of 1,500c.y. of concrete and 300 tons of reinforcing steel to complete.

Federal Corrections Institution – Berlin, NH

VR Concrete was awarded the Federal Corrections Institution, in Berlin, NH, in October of 2007. This was a two year project. This project included all site engineering, construction, project management, quality control and administrative activities. This 600,000s.f....

Meridan Hill Bridge Replacement – Columbia, NH

VR Concrete was contacted by the Town of Columbia, NH with a problem. They had a bridge that had to be replaced and the NH DOT gave them a budget estimate of $1,200,000.00. Since the town did not have that amount of money to dedicate to the project, they turned to VR...

West Dover Waste Water Treatment Facility Upgrades – West Dover, VT

The West Dover WWTF consisted of a large circular continuous loop reactor, anaerobic selector and a new headworks building. There were many highly detailed formwork challenges that were accomplished with ease by our seasoned crew. The project required 1,200c.y.of...

I-93 Widening Projects – NH

The NH DOT recognized a need to widen the I-93 corridor from the Massachusetts State line to Manchester, NH. This multi phased contract has been ongoing for several years and will not be completed until 2020. VR Concrete has been involved with many of the bridges that...

Bucksport Waste Water Treatment Facility Upgrades – Bucksport, ME

The Bucksport WWTF project will require 2,500c.y. of concrete and 330 tons of reinforcing steel to be installed on a very compact, ledge site. The many unique forming challenges on this project, combined with the limited work space, require constant planning and...

Falmouth Water Treatment Plant – Falmouth, MA

The City of Falmouth needed to increase the amount of clean drinking water it produced to meet peak demands during the summer season. They turned to Methuen Construction, who in turn hired VR Concrete, to meet the fast track schedule of this substantial project. When...

Newsletter

VR Concrete was awarded the 2015 Excellence in Concrete Award by Northern New England Concrete Promotions Association for our involvement in the Milton Cat project, in Manchester, NH.  Previously, VR Concrete had been awarded the 2009 Excellence in Concrete Award for...